{"id":88,"date":"2015-02-27T21:05:32","date_gmt":"2015-02-27T21:05:32","guid":{"rendered":"http:\/\/paksc.org\/pk\/?p=88"},"modified":"2015-02-27T21:05:32","modified_gmt":"2015-02-27T21:05:32","slug":"956-construction-of-biogas-digester","status":"publish","type":"post","link":"https:\/\/paksc.org\/pk\/biogas-plant-design\/956-construction-of-biogas-digester\/","title":{"rendered":"Construction of Portable Biogas Digester"},"content":{"rendered":"<div dir=\"ltr\">\n<p><strong>Construction of Portable Biogas Digester <\/strong><strong>Here is the description of the system, the basic principles are very simple, use the things you find in your surroundings.<\/strong><\/p>\n<table style=\"height: 496px;\" border=\"0\" width=\"252\" cellspacing=\"0\" cellpadding=\"0\" align=\"center\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" class=\" alignleft\" src=\"http:\/\/1.bp.blogspot.com\/-pZRwbj1Giw0\/T5Y44maa1cI\/AAAAAAAABsk\/8djVwjNnxks\/s400\/biogas+plant+outlet+15.JPG\" alt=\"\" width=\"260\" height=\"400\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td>1. Cut the top off at a 2.500 liter water tank.You have now made the stomach of your \u201csacred cow\u201d.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div><\/div>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\" align=\"center\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/3.bp.blogspot.com\/-wIylbWa_nMQ\/T5Y4wHQHdzI\/AAAAAAAABrk\/LkR7PTthysA\/s400\/biogas+digester+2.JPG\" alt=\"\" width=\"400\" height=\"360\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td>2. Drill 2\u201d hole at bottom of tank and 1\u201d hole at top of tank.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/2.bp.blogspot.com\/-0nCyrcC0QS8\/T5Y4xSptd3I\/AAAAAAAABrs\/ljibsO3M3l4\/s400\/biogas+digester+3.JPG\" alt=\"\" width=\"400\" height=\"390\" border=\"0\" \/><\/p>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\" align=\"center\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/1.bp.blogspot.com\/-2BaVLCv476E\/T5Y4yqqja8I\/AAAAAAAABr0\/FK0puwoybjI\/s400\/biogas+digester+4.JPG\" alt=\"\" width=\"283\" height=\"400\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td>Put tank adaptors in holes (threaded pipewith rubber gasket and locking nut, sometimes called bulkhead fittings (check aquarium shop).<\/p>\n<p>&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\" align=\"center\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/2.bp.blogspot.com\/-S9l52vIxxrQ\/T5Y4zndPaeI\/AAAAAAAABsA\/KoVOB1Svtyc\/s400\/biogas+digester+5.JPG\" alt=\"\" width=\"400\" height=\"357\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td>4. Fit 1\u201d pipe in top hole (pic 4.a) on outside and 2\u201d pipe inside tank that reaches to middle<br \/>\nof tank. Fit 2\u201d tube outside tank to elbow going into tank. This is your feeding tube or the \u201cthroat of the cow\u201d (pic 4.b-c).<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\" align=\"center\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/1.bp.blogspot.com\/-BhMmAz1c8t4\/T5Y403zJH_I\/AAAAAAAABsI\/FyrBcpOyyRk\/s400\/biogas+digester+6.JPG\" alt=\"\" width=\"400\" height=\"391\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td>biogas digester<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/3.bp.blogspot.com\/-FeSl9RyshGQ\/T5Y416XTfAI\/AAAAAAAABsM\/Kahr4qLdKVA\/s400\/biogas+digester+7.JPG\" alt=\"\" width=\"400\" height=\"266\" border=\"0\" \/><\/p>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\" align=\"center\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/1.bp.blogspot.com\/-5VEE3dOqrKA\/T5Y42-aC9lI\/AAAAAAAABsU\/D9mxhtvfJyg\/s400\/biogas+digester+8.JPG\" alt=\"\" width=\"400\" height=\"261\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>5. Gas Collector. Take another tank that is smaller in diameter than the \u201cstomach\u201d tank you made (one that fits inside) but try to get one as close to the first tank as possible (for a 2.500 \u201cstomach\u201d tank you may only be able to find a 2.000 l \u201cgas collector\u201d tank. Cut holes in the bottom of this tank as shown (pic 5).<\/p>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\" align=\"center\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/1.bp.blogspot.com\/-f9JhvnKEudY\/T5Y43ziKEnI\/AAAAAAAABsc\/qHkgexhCmH8\/s400\/biogas+digester+9.JPG\" alt=\"\" width=\"400\" height=\"341\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td>6. Cut 8 holes slightly larger than 2\u201d in bottom.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\" align=\"center\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/2.bp.blogspot.com\/-MyMc50GXbfI\/T5Y4nlqN2FI\/AAAAAAAABqg\/iIuX_bP0T3o\/s400\/biogas+digester+10.JPG\" alt=\"\" width=\"400\" height=\"343\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td>7. Burn or drill a \u00bd\u201d hole in the top of the gas collector tank near the side as shown.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\" align=\"center\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/1.bp.blogspot.com\/-wHRhNVDkX3A\/T5Y4ohF5GAI\/AAAAAAAABqk\/M7SdfVXUqrw\/s400\/biogas+digester+11.JPG\" alt=\"\" width=\"400\" height=\"267\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td>Put a \u00bd\u201d tank fitting in this hole<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\" align=\"center\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/2.bp.blogspot.com\/-DZR_SxGDH34\/T5Y4pfrEZkI\/AAAAAAAABqs\/gf00ZQvg_yI\/s400\/biogas+digester+12.JPG\" alt=\"\" width=\"400\" height=\"283\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>9. Put small stones at bottom of stomach tank as homes for bacteria, but do not block or go higher than the output of the feeding pipe.<\/p>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\" align=\"center\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/1.bp.blogspot.com\/-cUJvDtEyswU\/T5Y4p2jRGYI\/AAAAAAAABq4\/Lldr5JOnFtk\/s400\/biogas+digester+13.JPG\" alt=\"\" width=\"400\" height=\"265\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>10. Fill with about 300 to 500 liters of water (grey water is fine).Then pour in about 100 kg of animal manure (this keeps the manure from being exposed to too much oxygen.If you put manure in first you aerate it as you add water and that can kill bacteria. Bu sure and use fresh moist or wet fermented manure). Fill the stomach tank to the top until some drips out the 1\u201d pipe.<\/p>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\" align=\"center\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/2.bp.blogspot.com\/-6iOKGevPybI\/T5Y4rNbWs4I\/AAAAAAAABq8\/wXVpLWFaqw8\/s400\/biogas+digester+14.JPG\" alt=\"\" width=\"255\" height=\"400\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>11. Cut 8 2\u201d pipes slightly shorter than the height of the gas collector and cut holes in them like a church organ to let food in and gas out.<\/p>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\" align=\"center\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/2.bp.blogspot.com\/-O5rf5D64n3I\/T5Y4r8k10cI\/AAAAAAAABrI\/CiPidxCDa3w\/s400\/biogas+digester+15.JPG\" alt=\"\" width=\"255\" height=\"400\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td>12. Fix a piece of \u00bd\u201d pipe (A) through one end of the 2\u201d pipe and melt its ends so it flares out and can\u00b4t fall out of the 2\u201d pipe.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\" align=\"center\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/3.bp.blogspot.com\/-H3td-XB6jXA\/T5Y4tdySbkI\/AAAAAAAABrM\/NJVR0BFqLvo\/s400\/biogas+digester+16.JPG\" alt=\"\" width=\"400\" height=\"341\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td>13. Put the 2\u201d pipe in the larger than 2\u201d hole in the gas collector and when it is inserted, fix a \u00bd\u201d pipe (B) in the other end and flare it. Nowthe 2\u201d pipe can\u2019t fall out of the tank when it goes up and down. Do the same thing for the other 7 pipes. These are our \u201cbacterial motels\u201d or bacterial fuel rods!<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\" align=\"center\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/4.bp.blogspot.com\/-XlNZLWs3J7I\/T5Y4uEeLyyI\/AAAAAAAABrU\/ZqXx-djkyF4\/s400\/biogas+digester+17.JPG\" alt=\"\" width=\"400\" height=\"341\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td>Add caption<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\" align=\"center\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/2.bp.blogspot.com\/-kGIuXPSJfq0\/T5Y4u7IDNtI\/AAAAAAAABrc\/WSI2L8K4_Yg\/s400\/biogas+digester+18.JPG\" alt=\"\" width=\"400\" height=\"271\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td>14. Place the gas collector in the stomach tank. Let it sink down until completely submerged if possible, making sure that the bacteria hotels are straight up and down (you may need to turn the tank slowly as you put it in and let the air out\u201d.<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>15. Put an elbow, \u00bd\u201d valve and hose adaptor on the \u00bd\u201d tank adaptor and connect to \u00bd\u201d plastic tube.<\/p>\n<p>16. Wait 3 weeks or so with valve closed until gas collector starts to rise. Release all gas to air and let it rise again. Release all gas in case it has oxygen in it.<\/p>\n<p>17. The third time tank rises, try to light gas coming out. If it doesn\u2019t light it has too much CO<\/p>\n<p>2in it. Release it and let it rise again. One day it will light as CH2concentration rises.once it lights you can start slowly feeding.<\/p>\n<p>18. When you connect the outcoming gas tube with your cooking place, make sure that a simple \u201cwater trap\u201d is included, so that the pipes do not become blocked by condensing water.<\/p>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/4.bp.blogspot.com\/-6kceUViiaCA\/T5Y8W-7_R6I\/AAAAAAAABsw\/bxKwUHV7BGM\/s400\/digester+diagram.JPG\" alt=\"\" width=\"400\" height=\"290\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td>\n<h3>download diagram<\/h3>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h1>Biogas Pipeline Connection fittings<\/h1>\n<p>Biogas naturally contains water vapor.When it flows through a pipe, some of the vapor condenses as liquid water, and if it is left in the pipe, it will eventually collect and block the gas flow.The solution is a water trap, a simple device which allows the water to escape. It should be fitted to biogas pipes wherever there is a local low point of the pipe where water naturally collects. And pipes should be laid so that these low points are at easily accessible positions. The water trap consists of a T-joint running a short tube down from the main tube into a small container full of water. The pressure of the water prevents gas from escaping. The water level should be approximately 15cm (equivalent to 150 mbar) to ensure no gas loss. The container could be a plastic water bottle for example. As it fills with water it will slowly overflow, so the location should be one where a small amount of water leakage is okay. An inspection hole in the ground, for example, works well. Pipeline Connection<\/p>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/3.bp.blogspot.com\/--VPn0kqmiOA\/T5Y-yoXNK2I\/AAAAAAAABs4\/Niwq_uZ2_2Q\/s400\/biogas+pipe+line+1.JPG\" alt=\"\" width=\"400\" height=\"127\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td>Ideal pipe fitting<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/1.bp.blogspot.com\/-PAq57ZkUiUE\/T5Y-zmwigNI\/AAAAAAAABtA\/knP2Qb2GzXg\/s400\/biogas+pipe+line+2.JPG\" alt=\"\" width=\"400\" height=\"81\" border=\"0\" \/><\/p>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/1.bp.blogspot.com\/-U065qLEXeLk\/T5Y-081HO3I\/AAAAAAAABtI\/woDmKDrWQc4\/s400\/biogas+pipe+line.JPG\" alt=\"\" width=\"400\" height=\"125\" border=\"0\" \/><\/td>\n<\/tr>\n<tr>\n<td>bad pipe fitting<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/1.bp.blogspot.com\/-BqM_aHW4p9g\/T5Y-3vyNslI\/AAAAAAAABtY\/chPAW09xxTQ\/s400\/section.JPG\" alt=\"\" width=\"400\" height=\"285\" border=\"0\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/1.bp.blogspot.com\/-LfzTLs2N8XM\/T5Y-2f8lzTI\/AAAAAAAABtQ\/effuAAL0qKA\/s400\/dia.JPG\" alt=\"\" width=\"400\" height=\"283\" border=\"0\" \/><\/p>\n<h3>Parts of the bio gas digester:<\/h3>\n<p>inlet (mixing chamber) for cattle dung fed plant,digester (digestion chamber), gas holder (storage chamber), outlet (displacement chamber), gas conveyance system and slurry compost pit(s). The mix of dung and water (mixed in inlet or mixing chamber) passes through the inlet pipe to the digester. The mixer produces gas through digestion process in the digester and the produced gas is stored in the gas holder (top of dome). The digested slurry passes out from digester to outlet tank (displacement chamber)<\/p>\n<p>1. Inlet (Mixing Tank)<br \/>\n2. Inlet Pipe(s)<br \/>\n3. Digester<br \/>\n4. Gas Holder (dome)<br \/>\n5. Manhole<br \/>\n6. Outlet<br \/>\n7. Main Gas Pipe and Turret<br \/>\n8. Main Gas Valve<br \/>\n9. Pipeline<br \/>\n10. Water Outlet (Water Trap or Drain)<br \/>\n11. Pressure Gauge<br \/>\n12. Gas Tap<br \/>\n13. Gas Stove with rubber hose pipe<br \/>\n14. Gas Lamp (Optional)<br \/>\n15. Slurry pit(s)<\/p>\n<h3>Sea Also<\/h3>\n<ul>\n<li><a href=\"http:\/\/paksc.org\/pk\/diy-projects\/764-biogas-plant-experiment\/\" data-wpel-link=\"internal\">DIY biogas plant<\/a><\/li>\n<li><a href=\"http:\/\/paksc.org\/pk\/biogas-plant-design\/information-about-bioas-plant-gobar-gas-plant-in-urdu\/\" data-wpel-link=\"internal\">Biogas in Urdu<\/a><\/li>\n<li><a href=\"http:\/\/paksc.org\/pk\/biogas-plant-design\/957-biogas-digester-photos\/\" data-wpel-link=\"internal\">Biogas Digester Photos<\/a><\/li>\n<li><a href=\"http:\/\/paksc.org\/pk\/biogas-plant-design\/965-biogas-plant-photos-from-pdbp\/\" data-wpel-link=\"internal\">Biogas Plant Photos from PDBP<\/a><\/li>\n<li><a href=\"http:\/\/paksc.org\/pk\/biogas-plant-design\/955-biogas-plant-by-recycled-plastic-drum\/\" data-wpel-link=\"internal\">Small scale kitchen waste biogas plant<\/a><\/li>\n<li><a href=\"http:\/\/paksc.org\/pk\/science-articles-urdu\/879-biogas-column-by-aslam-khan\/\" data-wpel-link=\"internal\">Biogas In Pakistan - Pakistan Science Club<\/a><\/li>\n<li>\n<div>\n<p><a href=\"http:\/\/paksc.org\/pk\/biogas-plant-design\/419-what-is-biogas-gobar-gas\/\" data-wpel-link=\"internal\">How Does A Biogas Plant Work?<\/a><\/p>\n<\/div>\n<\/li>\n<li>\n<div>\n<p>How To Bio Gas Plant Works<\/p>\n<\/div>\n<\/li>\n<li>\n<div>\n<p>Biogas Plant Pakistan Science Club<\/p>\n<\/div>\n<\/li>\n<li>\n<div>\n<p>gobar Gas plant in pakistan ...<\/p>\n<\/div>\n<\/li>\n<li>\n<div>\n<p>Biogas Digester Photos<\/p>\n<\/div>\n<\/li>\n<\/ul>\n<div dir=\"ltr\">This biogas Plant Construction manual writing by T.H. Culhane publish publish in www.tamera.org\/fileadmin\/PDF\/biogas_digester.pdf<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Construction of Portable Biogas Digester Here is the description of the system, the basic principles are very simple, use the things you find in your surroundings. 1. Cut the top off at a 2.500 liter water tank.You have now made the stomach of your \u201csacred cow\u201d. 2. Drill 2\u201d hole at bottom of tank and&#8230;<\/p>\n","protected":false},"author":9,"featured_media":91,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[18],"tags":[19],"class_list":["post-88","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-biogas-plant-design","tag-biogas-plant"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction of Portable Biogas Digester -<\/title>\n<meta name=\"description\" content=\"Construction of Portable Biogas Digester step by step construction with very simple house hold materials, biogas plant can produce methane.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/paksc.org\/pk\/biogas-plant-design\/956-construction-of-biogas-digester\/\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Construction of Portable Biogas Digester -\" \/>\n<meta name=\"twitter:description\" content=\"Construction of Portable Biogas Digester step by step construction with very simple house hold materials, biogas plant can produce methane.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/02\/873599ca0af52bdbb5630522d6563fd5_L.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@abddulrauf\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Abdul Rauf\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/biogas-plant-design\\\/956-construction-of-biogas-digester\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/biogas-plant-design\\\/956-construction-of-biogas-digester\\\/\"},\"author\":{\"name\":\"Abdul Rauf\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#\\\/schema\\\/person\\\/bf4ee5124d38d2e77d82e679a0bd1c88\"},\"headline\":\"Construction of Portable Biogas Digester\",\"datePublished\":\"2015-02-27T21:05:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/biogas-plant-design\\\/956-construction-of-biogas-digester\\\/\"},\"wordCount\":1001,\"commentCount\":3,\"publisher\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/biogas-plant-design\\\/956-construction-of-biogas-digester\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/paksc.org\\\/pk\\\/wp-content\\\/uploads\\\/2015\\\/02\\\/873599ca0af52bdbb5630522d6563fd5_L.jpg\",\"keywords\":[\"biogas plant\"],\"articleSection\":[\"Biogas Plant Design\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/paksc.org\\\/pk\\\/biogas-plant-design\\\/956-construction-of-biogas-digester\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/biogas-plant-design\\\/956-construction-of-biogas-digester\\\/\",\"url\":\"https:\\\/\\\/paksc.org\\\/pk\\\/biogas-plant-design\\\/956-construction-of-biogas-digester\\\/\",\"name\":\"Construction of Portable Biogas Digester -\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/biogas-plant-design\\\/956-construction-of-biogas-digester\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/biogas-plant-design\\\/956-construction-of-biogas-digester\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/paksc.org\\\/pk\\\/wp-content\\\/uploads\\\/2015\\\/02\\\/873599ca0af52bdbb5630522d6563fd5_L.jpg\",\"datePublished\":\"2015-02-27T21:05:32+00:00\",\"description\":\"Construction of Portable Biogas Digester step by step construction with very simple house hold materials, biogas plant can produce methane.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/biogas-plant-design\\\/956-construction-of-biogas-digester\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/paksc.org\\\/pk\\\/biogas-plant-design\\\/956-construction-of-biogas-digester\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/biogas-plant-design\\\/956-construction-of-biogas-digester\\\/#primaryimage\",\"url\":\"https:\\\/\\\/paksc.org\\\/pk\\\/wp-content\\\/uploads\\\/2015\\\/02\\\/873599ca0af52bdbb5630522d6563fd5_L.jpg\",\"contentUrl\":\"https:\\\/\\\/paksc.org\\\/pk\\\/wp-content\\\/uploads\\\/2015\\\/02\\\/873599ca0af52bdbb5630522d6563fd5_L.jpg\",\"width\":500,\"height\":399,\"caption\":\"Construction of Portable Biogas Digester\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/biogas-plant-design\\\/956-construction-of-biogas-digester\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/paksc.org\\\/pk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction of Portable Biogas Digester\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#website\",\"url\":\"https:\\\/\\\/paksc.org\\\/pk\\\/\",\"name\":\"PSC Do Science\",\"description\":\"STEAM Resources, Science Experiments and Projects by PSC\",\"publisher\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/paksc.org\\\/pk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#organization\",\"name\":\"Pak Science Club\",\"url\":\"https:\\\/\\\/paksc.org\\\/pk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/paksc.org\\\/pk\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/Do-science-logo.png?fit=408%2C136&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/paksc.org\\\/pk\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/Do-science-logo.png?fit=408%2C136&ssl=1\",\"width\":408,\"height\":136,\"caption\":\"Pak Science Club\"},\"image\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#\\\/schema\\\/person\\\/bf4ee5124d38d2e77d82e679a0bd1c88\",\"name\":\"Abdul Rauf\",\"description\":\"Teacher, Innovator, Love to create, explore new ways to view &amp; imagine things and then make them real\",\"sameAs\":[\"https:\\\/\\\/paksc.org\\\/abdul\",\"https:\\\/\\\/www.facebook.com\\\/pk.rauf\",\"https:\\\/\\\/www.Instagram.com\\\/abddulrauf\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/abddulrauf\\\/\",\"https:\\\/\\\/x.com\\\/abddulrauf\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCyR0YwHgdaf0NXjr1sMPUDw\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction of Portable Biogas Digester -","description":"Construction of Portable Biogas Digester step by step construction with very simple house hold materials, biogas plant can produce methane.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/paksc.org\/pk\/biogas-plant-design\/956-construction-of-biogas-digester\/","twitter_card":"summary_large_image","twitter_title":"Construction of Portable Biogas Digester -","twitter_description":"Construction of Portable Biogas Digester step by step construction with very simple house hold materials, biogas plant can produce methane.","twitter_image":"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/02\/873599ca0af52bdbb5630522d6563fd5_L.jpg","twitter_creator":"@abddulrauf","twitter_misc":{"Written by":"Abdul Rauf","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/paksc.org\/pk\/biogas-plant-design\/956-construction-of-biogas-digester\/#article","isPartOf":{"@id":"https:\/\/paksc.org\/pk\/biogas-plant-design\/956-construction-of-biogas-digester\/"},"author":{"name":"Abdul Rauf","@id":"https:\/\/paksc.org\/pk\/#\/schema\/person\/bf4ee5124d38d2e77d82e679a0bd1c88"},"headline":"Construction of Portable Biogas Digester","datePublished":"2015-02-27T21:05:32+00:00","mainEntityOfPage":{"@id":"https:\/\/paksc.org\/pk\/biogas-plant-design\/956-construction-of-biogas-digester\/"},"wordCount":1001,"commentCount":3,"publisher":{"@id":"https:\/\/paksc.org\/pk\/#organization"},"image":{"@id":"https:\/\/paksc.org\/pk\/biogas-plant-design\/956-construction-of-biogas-digester\/#primaryimage"},"thumbnailUrl":"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/02\/873599ca0af52bdbb5630522d6563fd5_L.jpg","keywords":["biogas plant"],"articleSection":["Biogas Plant Design"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/paksc.org\/pk\/biogas-plant-design\/956-construction-of-biogas-digester\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/paksc.org\/pk\/biogas-plant-design\/956-construction-of-biogas-digester\/","url":"https:\/\/paksc.org\/pk\/biogas-plant-design\/956-construction-of-biogas-digester\/","name":"Construction of Portable Biogas Digester -","isPartOf":{"@id":"https:\/\/paksc.org\/pk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/paksc.org\/pk\/biogas-plant-design\/956-construction-of-biogas-digester\/#primaryimage"},"image":{"@id":"https:\/\/paksc.org\/pk\/biogas-plant-design\/956-construction-of-biogas-digester\/#primaryimage"},"thumbnailUrl":"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/02\/873599ca0af52bdbb5630522d6563fd5_L.jpg","datePublished":"2015-02-27T21:05:32+00:00","description":"Construction of Portable Biogas Digester step by step construction with very simple house hold materials, biogas plant can produce methane.","breadcrumb":{"@id":"https:\/\/paksc.org\/pk\/biogas-plant-design\/956-construction-of-biogas-digester\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/paksc.org\/pk\/biogas-plant-design\/956-construction-of-biogas-digester\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/paksc.org\/pk\/biogas-plant-design\/956-construction-of-biogas-digester\/#primaryimage","url":"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/02\/873599ca0af52bdbb5630522d6563fd5_L.jpg","contentUrl":"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/02\/873599ca0af52bdbb5630522d6563fd5_L.jpg","width":500,"height":399,"caption":"Construction of Portable Biogas Digester"},{"@type":"BreadcrumbList","@id":"https:\/\/paksc.org\/pk\/biogas-plant-design\/956-construction-of-biogas-digester\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/paksc.org\/pk\/"},{"@type":"ListItem","position":2,"name":"Construction of Portable Biogas Digester"}]},{"@type":"WebSite","@id":"https:\/\/paksc.org\/pk\/#website","url":"https:\/\/paksc.org\/pk\/","name":"PSC Do Science","description":"STEAM Resources, Science Experiments and Projects by PSC","publisher":{"@id":"https:\/\/paksc.org\/pk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/paksc.org\/pk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/paksc.org\/pk\/#organization","name":"Pak Science Club","url":"https:\/\/paksc.org\/pk\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/paksc.org\/pk\/#\/schema\/logo\/image\/","url":"https:\/\/i0.wp.com\/paksc.org\/pk\/wp-content\/uploads\/2016\/10\/Do-science-logo.png?fit=408%2C136&ssl=1","contentUrl":"https:\/\/i0.wp.com\/paksc.org\/pk\/wp-content\/uploads\/2016\/10\/Do-science-logo.png?fit=408%2C136&ssl=1","width":408,"height":136,"caption":"Pak Science Club"},"image":{"@id":"https:\/\/paksc.org\/pk\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/paksc.org\/pk\/#\/schema\/person\/bf4ee5124d38d2e77d82e679a0bd1c88","name":"Abdul Rauf","description":"Teacher, Innovator, Love to create, explore new ways to view &amp; imagine things and then make them real","sameAs":["https:\/\/paksc.org\/abdul","https:\/\/www.facebook.com\/pk.rauf","https:\/\/www.Instagram.com\/abddulrauf","https:\/\/www.linkedin.com\/in\/abddulrauf\/","https:\/\/x.com\/abddulrauf","https:\/\/www.youtube.com\/channel\/UCyR0YwHgdaf0NXjr1sMPUDw"]}]}},"jetpack_featured_media_url":"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/02\/873599ca0af52bdbb5630522d6563fd5_L.jpg","_links":{"self":[{"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/posts\/88","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/comments?post=88"}],"version-history":[{"count":0,"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/posts\/88\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/media\/91"}],"wp:attachment":[{"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/media?parent=88"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/categories?post=88"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/tags?post=88"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}