{"id":827,"date":"2015-03-12T13:25:21","date_gmt":"2015-03-12T13:25:21","guid":{"rendered":"http:\/\/paksc.org\/pk\/?p=827"},"modified":"2018-08-25T11:09:51","modified_gmt":"2018-08-25T11:09:51","slug":"how-to-make-a-transformer-for-inverter-ups-devices","status":"publish","type":"post","link":"https:\/\/paksc.org\/pk\/articles\/how-to-make-a-transformer-for-inverter-ups-devices\/","title":{"rendered":"How to Make a Electric Transformer Rewinding for inverter, UPS, Devices"},"content":{"rendered":"<h2>How to Make a Transformer for inverter, UPS, Devices<\/h2>\n<h3>Introduction:<\/h3>\n<p><strong>How to Make a Electric Transformer :<\/strong> The transformer is an electrical component is designed to change the level of voltage and current according to need.<\/p>\n<h3>Function<\/h3>\n<p><strong>How to Make a Electric Transformer<\/strong> :The electronic devices used to operate at different voltage levels delivered by the power supply companies, to operate these devices require a transformer. A transformer consists of a core of laminated silicon iron on which is wrapped a coil of insulated copper wire called magnet wire.<\/p>\n<p>The first coil receives power from the grid called primary coil and this coil generates a magnetic field which stimulates a motion of the electrons in the second coil producing a different voltage and current at the output. The difference of turns of wire between the primary and secondary coil creates a proportional difference between the input voltage and output voltage of the transformer.<\/p>\n<figure id=\"attachment_832\" aria-describedby=\"caption-attachment-832\" style=\"width: 651px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-3.jpg\" data-wpel-link=\"internal\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-832\" src=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-3.jpg\" alt=\"transformer construction \" width=\"651\" height=\"406\" srcset=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-3.jpg 651w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-3-300x187.jpg 300w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-3-170x106.jpg 170w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-3-370x231.jpg 370w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-3-400x249.jpg 400w\" sizes=\"auto, (max-width: 651px) 100vw, 651px\" \/><\/a><figcaption id=\"caption-attachment-832\" class=\"wp-caption-text\">Transformer construction<\/figcaption><\/figure>\n<p><strong>How to Make a Electric Transformer :<\/strong> The processor that we will build in this case is 115 to 18 volts ac which is ideal for the amplifier of 300 watts<\/p>\n<h3>Materials<\/h3>\n<figure id=\"attachment_834\" aria-describedby=\"caption-attachment-834\" style=\"width: 711px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-5.jpg\" data-wpel-link=\"internal\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-834\" src=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-5.jpg\" alt=\"Magnate wire \" width=\"711\" height=\"399\" srcset=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-5.jpg 711w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-5-300x168.jpg 300w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-5-170x95.jpg 170w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-5-370x208.jpg 370w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-5-400x224.jpg 400w\" sizes=\"auto, (max-width: 711px) 100vw, 711px\" \/><\/a><figcaption id=\"caption-attachment-834\" class=\"wp-caption-text\">Magnate wire<\/figcaption><\/figure>\n<p style=\"text-align: center;\">\u00a0Double layer magnet wire or Copper wire it\u00a0 is coated with dielectric varnish used in the manufacture of generators alternators, coils, electric motors, power transformers, etc.<\/p>\n<figure id=\"attachment_835\" aria-describedby=\"caption-attachment-835\" style=\"width: 702px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-6.jpg\" data-wpel-link=\"internal\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-835 size-full\" title=\"Silicon iron sheets \" src=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-6.jpg\" alt=\"transformer construction (6)\" width=\"702\" height=\"396\" srcset=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-6.jpg 702w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-6-300x169.jpg 300w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-6-170x96.jpg 170w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-6-370x209.jpg 370w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-6-400x226.jpg 400w\" sizes=\"auto, (max-width: 702px) 100vw, 702px\" \/><\/a><figcaption id=\"caption-attachment-835\" class=\"wp-caption-text\">Silicon iron sheets<\/figcaption><\/figure>\n<p style=\"text-align: center;\">Silicon iron sheets (these silicon iron sheets come in the shape of the letter (I) and letter (E) interspersed forming the core of the transformer.<\/p>\n<figure id=\"attachment_836\" aria-describedby=\"caption-attachment-836\" style=\"width: 640px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-7.jpg\" data-wpel-link=\"internal\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-836\" src=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-7.jpg\" alt=\"Waxed paper \" width=\"640\" height=\"361\" srcset=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-7.jpg 640w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-7-300x169.jpg 300w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-7-170x96.jpg 170w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-7-370x209.jpg 370w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-7-400x226.jpg 400w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><figcaption id=\"caption-attachment-836\" class=\"wp-caption-text\">Waxed paper<\/figcaption><\/figure>\n<p style=\"text-align: center;\">Waxed paper or pressboard (this role is used to isolate the windings or coils of wire together.)It has a paraffin bath which makes it flexible and ductile. It also seals out moisture and gives heat resistance preventing it from crystallizing.<\/p>\n<figure id=\"attachment_837\" aria-describedby=\"caption-attachment-837\" style=\"width: 640px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-8.jpg\" data-wpel-link=\"internal\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-837\" src=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-8.jpg\" alt=\"Masking tape\" width=\"640\" height=\"360\" srcset=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-8.jpg 640w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-8-300x169.jpg 300w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-8-170x96.jpg 170w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-8-370x208.jpg 370w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-8-400x225.jpg 400w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><figcaption id=\"caption-attachment-837\" class=\"wp-caption-text\">Masking tape<\/figcaption><\/figure>\n<p style=\"text-align: center;\">Masking tape (it is used to hold paper and wire between the windings.<\/p>\n<figure id=\"attachment_838\" aria-describedby=\"caption-attachment-838\" style=\"width: 637px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-9.jpg\" data-wpel-link=\"internal\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-838 size-full\" title=\"Foot screws and squares \" src=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-9.jpg\" alt=\"Foot screws and squares \" width=\"637\" height=\"358\" srcset=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-9.jpg 637w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-9-300x169.jpg 300w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-9-170x96.jpg 170w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-9-370x208.jpg 370w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-9-400x225.jpg 400w\" sizes=\"auto, (max-width: 637px) 100vw, 637px\" \/><\/a><figcaption id=\"caption-attachment-838\" class=\"wp-caption-text\">Foot screws and squares<\/figcaption><\/figure>\n<p style=\"text-align: center;\">Foot screws and squares (the screws used to tighten the plates of iron squares or brackets ( used to adjust the transformer to the chassis or cabinet<\/p>\n<figure id=\"attachment_839\" aria-describedby=\"caption-attachment-839\" style=\"width: 640px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-10.jpg\" data-wpel-link=\"internal\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-839 size-full\" title=\"Formwork \" src=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-10.jpg\" alt=\"Formwork \" width=\"640\" height=\"361\" srcset=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-10.jpg 640w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-10-300x169.jpg 300w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-10-170x96.jpg 170w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-10-370x209.jpg 370w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-10-400x226.jpg 400w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><figcaption id=\"caption-attachment-839\" class=\"wp-caption-text\">Formwork<\/figcaption><\/figure>\n<p style=\"text-align: center;\">Form work (square one reel is used as support for winding the wire and prevent spreading helping the smooth narrowing of the wire. the formwork are available in various materials such as plastic, cardboard and fiberglass.<\/p>\n<figure id=\"attachment_841\" aria-describedby=\"caption-attachment-841\" style=\"width: 300px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-12.jpg\" data-wpel-link=\"internal\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-841 size-medium\" title=\"geometrical diagram\" src=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-12-300x169.jpg\" alt=\"transformer construction (12)\" width=\"300\" height=\"169\" srcset=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-12-300x169.jpg 300w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-12-170x96.jpg 170w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-12-370x209.jpg 370w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-12-400x226.jpg 400w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-12.jpg 640w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-841\" class=\"wp-caption-text\">geometrical diagram<\/figcaption><\/figure>\n<p><a href=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-13.jpg\" data-wpel-link=\"internal\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-842 size-medium aligncenter\" src=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-13-300x169.jpg\" alt=\"transformer construction (13)\" width=\"300\" height=\"169\" srcset=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-13-300x169.jpg 300w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-13-170x96.jpg 170w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-13-370x208.jpg 370w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-13-400x225.jpg 400w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-13.jpg 640w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a> <a href=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-11.jpg\" data-wpel-link=\"internal\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-840 size-medium aligncenter\" title=\"geometrical diagram\" src=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-11-300x168.jpg\" alt=\"transformer construction (11)\" width=\"300\" height=\"168\" srcset=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-11-300x168.jpg 300w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-11-170x95.jpg 170w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-11-370x208.jpg 370w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-11-288x160.jpg 288w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-11-400x224.jpg 400w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-11.jpg 640w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>The geometrical diagram, 7 planes designed formwork, = which may be downloaded from our web site and then build them in straw or cardboard. It must make the pieces of cardboard gluing with glue for wood reinforced with masking tape and a coat of varnish which protects the reel from moisture giving consistency and durability.<\/p>\n<p>&nbsp;<\/p>\n<h3>Calculation of transformers Formula<\/h3>\n<p><strong>Online<\/strong> tool for <a href=\"http:\/\/hyperphysics.phy-astr.gsu.edu\/hbase\/magnetic\/tracir2.html\" target=\"_blank\" rel=\"noopener nofollow external noreferrer\" data-wpel-link=\"external\">transformer calculate\u00a0 <\/a><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\" aligncenter\" src=\"http:\/\/www.electronicecircuits.com\/wp-content\/uploads\/2010\/06\/Transformer-Calculation-software-program-download.png\" alt=\"\" width=\"484\" height=\"344\" \/>or use other software to calculate winding of transformer<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/1-Fullscreen-capture-3122015-60333-PM.jpg\" data-wpel-link=\"internal\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-851\" src=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/1-Fullscreen-capture-3122015-60333-PM.jpg\" alt=\"1-Fullscreen capture 3122015 60333 PM\" width=\"513\" height=\"336\" srcset=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/1-Fullscreen-capture-3122015-60333-PM.jpg 513w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/1-Fullscreen-capture-3122015-60333-PM-300x196.jpg 300w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/1-Fullscreen-capture-3122015-60333-PM-170x110.jpg 170w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/1-Fullscreen-capture-3122015-60333-PM-168x110.jpg 168w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/1-Fullscreen-capture-3122015-60333-PM-370x242.jpg 370w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/1-Fullscreen-capture-3122015-60333-PM-400x262.jpg 400w\" sizes=\"auto, (max-width: 513px) 100vw, 513px\" \/><\/a><\/p>\n<p>Before the construction of a transformer you should study our article on how to calculate a transformer. To calculate the number of turns of wire we take the core area is the product of multiplying side by side of the mold. In this case we have a formwork of 5 by 3.8 inches which gives us a core with an area of 19 square centimeters.<\/p>\n<p>We take the constant 42 and divide by 19 for 2.21 turns per volt as on our case we have a voltage of 115 volts multiply by the number of turns per volt now we know how many laps given in the primary winding. For the secondary winding in this case 18 volts, multiply by the number of turns per volt and 40 turns of wire get doubles.<\/p>\n<h3>How to Make a Electric Transformer Construction Video:<\/h3>\n<p><iframe loading=\"lazy\" src=\"\/\/www.dailymotion.com\/embed\/video\/xz13cw?logo=0&amp;info=0\" width=\"100%\" height=\"450\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><span style=\"display: inline-block; width: 0px; overflow: hidden; line-height: 0;\" data-mce-type=\"bookmark\" class=\"mce_SELRES_start\">\ufeff<\/span><\/iframe><\/p>\n<figure id=\"attachment_847\" aria-describedby=\"caption-attachment-847\" style=\"width: 640px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-18.jpg\" data-wpel-link=\"internal\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-847 size-full\" title=\"silicon iron plates \" src=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-18.jpg\" alt=\"transformer construction (18)\" width=\"640\" height=\"360\" srcset=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-18.jpg 640w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-18-300x169.jpg 300w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-18-170x96.jpg 170w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-18-370x208.jpg 370w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-18-400x225.jpg 400w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><figcaption id=\"caption-attachment-847\" class=\"wp-caption-text\">silicon iron plates<\/figcaption><\/figure>\n<figure id=\"attachment_848\" aria-describedby=\"caption-attachment-848\" style=\"width: 640px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-19.jpg\" data-wpel-link=\"internal\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-848 size-full\" title=\"Testing a electric transformer \" src=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-19.jpg\" alt=\"transformer construction (19)\" width=\"640\" height=\"361\" srcset=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-19.jpg 640w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-19-300x169.jpg 300w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-19-170x96.jpg 170w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-19-370x209.jpg 370w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-19-400x226.jpg 400w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><figcaption id=\"caption-attachment-848\" class=\"wp-caption-text\">Testing a electric transformer<\/figcaption><\/figure>\n<figure id=\"attachment_845\" aria-describedby=\"caption-attachment-845\" style=\"width: 640px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-16.jpg\" data-wpel-link=\"internal\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-845 size-full\" title=\"Transformer coiling\" src=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-16.jpg\" alt=\"transformer construction (16)\" width=\"640\" height=\"361\" srcset=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-16.jpg 640w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-16-300x169.jpg 300w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-16-170x96.jpg 170w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-16-370x209.jpg 370w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-16-400x226.jpg 400w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><figcaption id=\"caption-attachment-845\" class=\"wp-caption-text\">Transformer coiling<\/figcaption><\/figure>\n<figure id=\"attachment_844\" aria-describedby=\"caption-attachment-844\" style=\"width: 640px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-15.jpg\" data-wpel-link=\"internal\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-844 size-full\" title=\"Transformer coiling soldiering \" src=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-15.jpg\" alt=\"transformer construction (15)\" width=\"640\" height=\"361\" srcset=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-15.jpg 640w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-15-300x169.jpg 300w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-15-170x96.jpg 170w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-15-370x209.jpg 370w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-15-400x226.jpg 400w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><figcaption id=\"caption-attachment-844\" class=\"wp-caption-text\">Transformer coiling soldiering<\/figcaption><\/figure>\n<figure id=\"attachment_843\" aria-describedby=\"caption-attachment-843\" style=\"width: 640px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-14.jpg\" data-wpel-link=\"internal\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-843 size-full\" title=\"coiling \" src=\"http:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-14.jpg\" alt=\"transformer construction (14)\" width=\"640\" height=\"360\" srcset=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-14.jpg 640w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-14-300x169.jpg 300w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-14-170x96.jpg 170w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-14-370x208.jpg 370w, https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-14-400x225.jpg 400w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><figcaption id=\"caption-attachment-843\" class=\"wp-caption-text\">coiling<\/figcaption><\/figure>\n<p><strong>See Also:<\/strong><\/p>\n<p><a title=\"Make your own 50 to 500 watt Power inverter UPS in Urdu\" href=\"http:\/\/paksc.org\/pk\/science-experiments-urdu\/839-make-your-own-50-to-500-watt-power-inverter-ups-in-urdu\/\" data-wpel-link=\"internal\">How to make Power inverter<\/a><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>How to Make a Transformer for inverter, UPS, Devices Introduction: How to Make a Electric Transformer : The transformer is an electrical component is designed to change the level of voltage and current according to need. Function How to Make a Electric Transformer :The electronic devices used to operate at different voltage levels delivered by&#8230;<\/p>\n","protected":false},"author":9,"featured_media":832,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[32],"tags":[41,55,8],"class_list":["post-827","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articles","tag-electric-transformer","tag-electricity","tag-make-your-own"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How to Make a Electric Transformer Rewinding for inverter, UPS, Devices<\/title>\n<meta name=\"description\" content=\"How to Make a Electric Transformer Rewinding for inverter, UPS, Devices, construction of step up and step down transformer, design calculator\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/paksc.org\/pk\/articles\/how-to-make-a-transformer-for-inverter-ups-devices\/\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"How to Make a Electric Transformer Rewinding for inverter, UPS, Devices\" \/>\n<meta name=\"twitter:description\" content=\"How to Make a Electric Transformer Rewinding for inverter, UPS, Devices, construction of step up and step down transformer, design calculator\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-3.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@abddulrauf\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Abdul Rauf\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/articles\\\/how-to-make-a-transformer-for-inverter-ups-devices\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/articles\\\/how-to-make-a-transformer-for-inverter-ups-devices\\\/\"},\"author\":{\"name\":\"Abdul Rauf\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#\\\/schema\\\/person\\\/bf4ee5124d38d2e77d82e679a0bd1c88\"},\"headline\":\"How to Make a Electric Transformer Rewinding for inverter, UPS, Devices\",\"datePublished\":\"2015-03-12T13:25:21+00:00\",\"dateModified\":\"2018-08-25T11:09:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/articles\\\/how-to-make-a-transformer-for-inverter-ups-devices\\\/\"},\"wordCount\":693,\"commentCount\":2,\"publisher\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/articles\\\/how-to-make-a-transformer-for-inverter-ups-devices\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/paksc.org\\\/pk\\\/wp-content\\\/uploads\\\/2015\\\/03\\\/transformer-construction-3.jpg\",\"keywords\":[\"Electric Transformer\",\"electricity\",\"Make your own\"],\"articleSection\":[\"Articles\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/paksc.org\\\/pk\\\/articles\\\/how-to-make-a-transformer-for-inverter-ups-devices\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/articles\\\/how-to-make-a-transformer-for-inverter-ups-devices\\\/\",\"url\":\"https:\\\/\\\/paksc.org\\\/pk\\\/articles\\\/how-to-make-a-transformer-for-inverter-ups-devices\\\/\",\"name\":\"How to Make a Electric Transformer Rewinding for inverter, UPS, Devices\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/articles\\\/how-to-make-a-transformer-for-inverter-ups-devices\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/articles\\\/how-to-make-a-transformer-for-inverter-ups-devices\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/paksc.org\\\/pk\\\/wp-content\\\/uploads\\\/2015\\\/03\\\/transformer-construction-3.jpg\",\"datePublished\":\"2015-03-12T13:25:21+00:00\",\"dateModified\":\"2018-08-25T11:09:51+00:00\",\"description\":\"How to Make a Electric Transformer Rewinding for inverter, UPS, Devices, construction of step up and step down transformer, design calculator\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/articles\\\/how-to-make-a-transformer-for-inverter-ups-devices\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/paksc.org\\\/pk\\\/articles\\\/how-to-make-a-transformer-for-inverter-ups-devices\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/articles\\\/how-to-make-a-transformer-for-inverter-ups-devices\\\/#primaryimage\",\"url\":\"https:\\\/\\\/paksc.org\\\/pk\\\/wp-content\\\/uploads\\\/2015\\\/03\\\/transformer-construction-3.jpg\",\"contentUrl\":\"https:\\\/\\\/paksc.org\\\/pk\\\/wp-content\\\/uploads\\\/2015\\\/03\\\/transformer-construction-3.jpg\",\"width\":651,\"height\":406,\"caption\":\"transformer construction\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/articles\\\/how-to-make-a-transformer-for-inverter-ups-devices\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/paksc.org\\\/pk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Make a Electric Transformer Rewinding for inverter, UPS, Devices\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#website\",\"url\":\"https:\\\/\\\/paksc.org\\\/pk\\\/\",\"name\":\"PSC Do Science\",\"description\":\"STEAM Resources, Science Experiments and Projects by PSC\",\"publisher\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/paksc.org\\\/pk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#organization\",\"name\":\"Pak Science Club\",\"url\":\"https:\\\/\\\/paksc.org\\\/pk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/paksc.org\\\/pk\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/Do-science-logo.png?fit=408%2C136&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/paksc.org\\\/pk\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/Do-science-logo.png?fit=408%2C136&ssl=1\",\"width\":408,\"height\":136,\"caption\":\"Pak Science Club\"},\"image\":{\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/paksc.org\\\/pk\\\/#\\\/schema\\\/person\\\/bf4ee5124d38d2e77d82e679a0bd1c88\",\"name\":\"Abdul Rauf\",\"description\":\"Teacher, Innovator, Love to create, explore new ways to view &amp; imagine things and then make them real\",\"sameAs\":[\"https:\\\/\\\/paksc.org\\\/abdul\",\"https:\\\/\\\/www.facebook.com\\\/pk.rauf\",\"https:\\\/\\\/www.Instagram.com\\\/abddulrauf\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/abddulrauf\\\/\",\"https:\\\/\\\/x.com\\\/abddulrauf\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCyR0YwHgdaf0NXjr1sMPUDw\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to Make a Electric Transformer Rewinding for inverter, UPS, Devices","description":"How to Make a Electric Transformer Rewinding for inverter, UPS, Devices, construction of step up and step down transformer, design calculator","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/paksc.org\/pk\/articles\/how-to-make-a-transformer-for-inverter-ups-devices\/","twitter_card":"summary_large_image","twitter_title":"How to Make a Electric Transformer Rewinding for inverter, UPS, Devices","twitter_description":"How to Make a Electric Transformer Rewinding for inverter, UPS, Devices, construction of step up and step down transformer, design calculator","twitter_image":"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-3.jpg","twitter_creator":"@abddulrauf","twitter_misc":{"Written by":"Abdul Rauf","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/paksc.org\/pk\/articles\/how-to-make-a-transformer-for-inverter-ups-devices\/#article","isPartOf":{"@id":"https:\/\/paksc.org\/pk\/articles\/how-to-make-a-transformer-for-inverter-ups-devices\/"},"author":{"name":"Abdul Rauf","@id":"https:\/\/paksc.org\/pk\/#\/schema\/person\/bf4ee5124d38d2e77d82e679a0bd1c88"},"headline":"How to Make a Electric Transformer Rewinding for inverter, UPS, Devices","datePublished":"2015-03-12T13:25:21+00:00","dateModified":"2018-08-25T11:09:51+00:00","mainEntityOfPage":{"@id":"https:\/\/paksc.org\/pk\/articles\/how-to-make-a-transformer-for-inverter-ups-devices\/"},"wordCount":693,"commentCount":2,"publisher":{"@id":"https:\/\/paksc.org\/pk\/#organization"},"image":{"@id":"https:\/\/paksc.org\/pk\/articles\/how-to-make-a-transformer-for-inverter-ups-devices\/#primaryimage"},"thumbnailUrl":"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-3.jpg","keywords":["Electric Transformer","electricity","Make your own"],"articleSection":["Articles"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/paksc.org\/pk\/articles\/how-to-make-a-transformer-for-inverter-ups-devices\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/paksc.org\/pk\/articles\/how-to-make-a-transformer-for-inverter-ups-devices\/","url":"https:\/\/paksc.org\/pk\/articles\/how-to-make-a-transformer-for-inverter-ups-devices\/","name":"How to Make a Electric Transformer Rewinding for inverter, UPS, Devices","isPartOf":{"@id":"https:\/\/paksc.org\/pk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/paksc.org\/pk\/articles\/how-to-make-a-transformer-for-inverter-ups-devices\/#primaryimage"},"image":{"@id":"https:\/\/paksc.org\/pk\/articles\/how-to-make-a-transformer-for-inverter-ups-devices\/#primaryimage"},"thumbnailUrl":"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-3.jpg","datePublished":"2015-03-12T13:25:21+00:00","dateModified":"2018-08-25T11:09:51+00:00","description":"How to Make a Electric Transformer Rewinding for inverter, UPS, Devices, construction of step up and step down transformer, design calculator","breadcrumb":{"@id":"https:\/\/paksc.org\/pk\/articles\/how-to-make-a-transformer-for-inverter-ups-devices\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/paksc.org\/pk\/articles\/how-to-make-a-transformer-for-inverter-ups-devices\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/paksc.org\/pk\/articles\/how-to-make-a-transformer-for-inverter-ups-devices\/#primaryimage","url":"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-3.jpg","contentUrl":"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-3.jpg","width":651,"height":406,"caption":"transformer construction"},{"@type":"BreadcrumbList","@id":"https:\/\/paksc.org\/pk\/articles\/how-to-make-a-transformer-for-inverter-ups-devices\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/paksc.org\/pk\/"},{"@type":"ListItem","position":2,"name":"How to Make a Electric Transformer Rewinding for inverter, UPS, Devices"}]},{"@type":"WebSite","@id":"https:\/\/paksc.org\/pk\/#website","url":"https:\/\/paksc.org\/pk\/","name":"PSC Do Science","description":"STEAM Resources, Science Experiments and Projects by PSC","publisher":{"@id":"https:\/\/paksc.org\/pk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/paksc.org\/pk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/paksc.org\/pk\/#organization","name":"Pak Science Club","url":"https:\/\/paksc.org\/pk\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/paksc.org\/pk\/#\/schema\/logo\/image\/","url":"https:\/\/i0.wp.com\/paksc.org\/pk\/wp-content\/uploads\/2016\/10\/Do-science-logo.png?fit=408%2C136&ssl=1","contentUrl":"https:\/\/i0.wp.com\/paksc.org\/pk\/wp-content\/uploads\/2016\/10\/Do-science-logo.png?fit=408%2C136&ssl=1","width":408,"height":136,"caption":"Pak Science Club"},"image":{"@id":"https:\/\/paksc.org\/pk\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/paksc.org\/pk\/#\/schema\/person\/bf4ee5124d38d2e77d82e679a0bd1c88","name":"Abdul Rauf","description":"Teacher, Innovator, Love to create, explore new ways to view &amp; imagine things and then make them real","sameAs":["https:\/\/paksc.org\/abdul","https:\/\/www.facebook.com\/pk.rauf","https:\/\/www.Instagram.com\/abddulrauf","https:\/\/www.linkedin.com\/in\/abddulrauf\/","https:\/\/x.com\/abddulrauf","https:\/\/www.youtube.com\/channel\/UCyR0YwHgdaf0NXjr1sMPUDw"]}]}},"jetpack_featured_media_url":"https:\/\/paksc.org\/pk\/wp-content\/uploads\/2015\/03\/transformer-construction-3.jpg","_links":{"self":[{"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/posts\/827","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/comments?post=827"}],"version-history":[{"count":0,"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/posts\/827\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/media\/832"}],"wp:attachment":[{"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/media?parent=827"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/categories?post=827"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/paksc.org\/pk\/wp-json\/wp\/v2\/tags?post=827"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}